AS CB15.3-1967 72 PDF

Click here to purchase
Applies to shop and site arc-welding using manual, automatic or semi-automatic fusion welding processes for Class 1 and Class 2 piping installations. Tables list parent metal, electrodes, preheating and post heat-treatment requirements. Preparation, assembly and welding of butt joints, branches and bosses, gusseted bends, flanges, sockets and structural attachments are covered. Acceptance, non-destructive and qualification testing are detailed; requirements for preparation of macro-etch specimens and inspection of etched sections are given in appendices.

Product Details

Edition:
1st
Published:
01/01/1967
ISBN(s):
0726229768
Number of Pages:
55
File Size:
1 file , 1.3 MB
Product Code(s):
10162582
Note:
This product is unavailable in Belarus, Russia